ARK / Case Studies

Taiwan - Local flood detention of Youcailiao Drainage in Yunlin County

Adaptation Framework : Promote implementation

Adaptation Option : Structural

Issue : Land subsidence, flooding

Core Content : On-site flood detention, agricultural damage compensation

Case Characteristics : practical operation

  Scale : Townships/Communities

  Author : Xiao Yihua

  View : 3024

Issues and Objectives

Yunlin County is located in the central region of Taiwan. Parts of the county are situated on the Chianan Plain, where the terrain is flat, making it one of Taiwan's major agricultural counties, also known as the "Agricultural Capital." In addition to its flat terrain, the area is located on the southern half of the Zhuoshui River alluvial fan, making it suitable for growing crops. Furthermore, there is extensive aquaculture in the coastal areas, which has led to increased groundwater extraction and subsequent land subsidence. Cumulative subsidence has persisted since 1992, with the overall subsidence center concentrated in Baozhong Township, Tuku Township, Huwei Township, and Yuanzhang Township, as generally shown in Figure 1. Due to the aforementioned reasons, the area faces the threat of flooding whenever typhoons or torrential rains occur, leading to losses for farmers. For example, large-scale flooding disasters due to excessive rainfall occurred during Typhoon Kong-rey in 2013, the 0601 torrential rain in 2017, the 0823 torrential rain in 2018, and the torrential rain from July 31 to August 2 in 2021.

Figure 1. Cumulative Subsidence Map of Yunlin Area from 1992 to 2021 (Image Source: Land Subsidence Prevention Information Website)


Improvement Measures Taken

To resolve the perennial flooding problems in Baozhong Township, a low-lying area in Yunlin County, the Water Resources Agency of the Ministry of Economic Affairs implemented the Youcailiao On-site Water Detention Project in Youcai Village. This project utilizes ecological engineering methods for localized water detention, raising the farmers' land by about 50 cm to 1 meter and storing water without changing the existing land use status. Without expropriating the farmland, farmers can still cultivate their land, retain their farmer insurance eligibility, and the natural features are preserved. Compared to the construction of traditional detention basins, this project has lower costs and a shorter construction period. The subsidy contract includes compensation for crop damage due to water retention, compensation for crop damage due to engineering work, and a water detention incentive payment to encourage farmers to provide land for detention. Overall, this project combines minor structural engineering methods with institutional regulations.

The Youcailiao On-site Water Detention Project is planned for 1,150 hectares, divided into Phase I (614 hectares) and Phase II (536 hectares). This includes raising field ridges, managing sluice gates, and installing simple water gates, all completed in 2022, capable of holding 2.09 million cubic meters of water. The engineering methods are shown in Figure 2, and the project location is shown in Figure 3. For the incentive payments, three different levels (A to C) of water detention incentives were planned, with detailed specifications shown in Table 1.

Figure 2. Description of Youcailiao On-site Water Detention Engineering Method (a) Raised Field Ridge (b) Simple Water Gate (Source: The Fifth River Management Office, Water Resources Agency, MOEA)

Table 1. Water Detention Incentive Payments (Source: The Fifth River Management Office, Water Resources Agency, MOEA)

Level Water Detention Depth (cm) Water Detention Volume (m3/ha) Incentive Payment (Annually)
A 25-50 2500-5000 NT$10,000/ha
B 50-75 5000-7500 NT$15,000/ha
C 75 and above 7500 and above NT$20,000/ha


Results

Prior to implementing the main project, a 2-hectare pilot project was first carried out. The effectiveness of this pilot project in providing localized water detention was demonstrated in a timely manner during the torrential rain event of July 31, 2021, which prevented the village from suffering disaster. Only then was the main project expanded and promoted. It is estimated that this project can reduce the flooded area by approximately 358 hectares, effectively lower the water level at the Tongbei Bridge by about 0.94 meters, and reduce the flow rate by approximately 62 cubic meters per second (cms).


References

Briefing on the Expected Benefits of the Yu-Tainiao Drainage System for Local Flood Detention, Fifth River Management Office, Water Resources Agency, Ministry of Economic Affairs (PDF file)


Reference Websites

Land subsidence disaster prevention information network

http://www.lsprc.ncku.edu.tw/zh-tw/trend.php?action=view&id=18

FTV News Network

https://www.ftvnews.com.tw/news/detail/2023429C14M1

Ministry of Economic Affairs, Water Resources Agency - Electronic Newsletter No. 0469

https://epaper.wra.gov.tw/Article_Detail.aspx?s=7339&n=30177


Attachments

  1. 有才寮在地滯洪簡報.pdf

2026 © All Rights Reserved.   Powered by NCHC  

About us

The Taiwan Climate Change Projection Information and Adaptation Knowledge Platform (TCCIP) coordinated by National Science and Technology Center for Disaster Reduction (NCDR) is one of three major climate change projects funded by National Science and Technology Council. The TCCIP project not only produces climate change data for impact assessments and adaptations but also aims to support national adaptation policy framework.